Increase of the Efficiency of Heat Supply Units of the CHP Plants Due to the Choice of Rational Heat Release Modes
DOI | https://doi.org/10.15407/pmach2024.01.046 |
Journal | Journal of Mechanical Engineering – Problemy Mashynobuduvannia |
Publisher | Anatolii Pidhornyi Institute for Mechanical Engineering Problems of National Academy of Science of Ukraine |
ISSN | 2709-2984 (Print), 2709-2992 (Online) |
Issue | Vol. 27, no. 1, 2024 (March) |
Pages | 46-55 |
Cited by | J. of Mech. Eng., 2024, vol. 27, no. 1, pp. 46-55 |
Authors
Oleksandr L. Shubenko, Anatolii Pidhornyi Institute of Mechanical Engineering Problems of NAS of Ukraine (2/10, Pozharskyi str., Kharkiv, 61046, Ukraine), e-mail: shuben@ipmach.kharkov.ua, ORCID: 0000-0001-9014-1357
Svitlana V. Alyokhina, University of Applied Sciences Technikum Wien (Höchstädtplatz 6, 1200 Wien, Austria), e-mail: svitlana.alyokhina@gmail.com, ORCID: 0000-0002-2967-0150
Volodymyr M. Holoshchapov, Anatolii Pidhornyi Institute of Mechanical Engineering Problems of NAS of Ukraine (2/10, Pozharskyi str., Kharkiv, 61046, Ukraine), e-mail: goloshchapov36@gmail.com, ORCID: 0000-0002-2075-5326
Olha A. Babenko, Anatolii Pidhornyi Institute of Mechanical Engineering Problems of NAS of Ukraine (2/10, Pozharskyi str., Kharkiv, 61046, Ukraine), e-mail: ola_babenko@meta.ua, ORCID: 0000-0002-7587-8470
Olha V. Kotulska, Anatolii Pidhornyi Institute of Mechanical Engineering Problems of NAS of Ukraine (2/10, Pozharskyi str., Kharkiv, 61046, Ukraine), e-mail: kot2017ov@gmail.com, ORCID: 0000-0002-5902-9313
Abstract
The possibilities of increasing the efficiency of heat supply turbines of CHPPs due to the choice of rational modes of operation of network water heaters are analyzed. With the help of a software and computing complex developed at the Institute of Mechanical Engineering Problems of the National Academy of Sciences of Ukraine and adapted by the authors to the operating conditions of CHPP generating equipment with one or two network heaters, a set of calculation studies of various ways of connecting them depending on the outdoor air temperature is conducted in the paper. Areas of positive effect associated with increase in the electric power of the power plant have been established. The calculation study was carried out at typical power plant water consumption from 1000 t/h to 4500 t/h, in the range of changes in the outdoor air temperature from -11 ºС to 10 ºС (heating season) and more than 10 ºС (hot water supply). The load change of the power unit was carried out due to the consumption of fresh steam at a constant pressure and temperature at the turbine inlet. As shown by the results of the operation of the T-100/120-130 heat supply turbine in operating conditions with one or two heat supply steam selections, in the area of positive outdoor air temperatures above 2 ºС, it is advisable to use one lower selection (with the upper one turned off) for all network water consumption. At the same time, additional electric power in the area of outdoor air temperatures above 6ºС can be from 0.25 MW to 2.15 MW. However, when the outdoor air temperature is less than 2 ºС, work with one lower heating selection becomes irrational. From the point of view of choosing rational modes of operation of turbine plants, the most important are the results of determining the optimal distribution of heat load between network heaters. The gain in electrical power of the turbine can be up to 2.46 MW in the nominal mode of operation with two heaters, and up to 7.84 MW in comparison with the use of single-stage heating. The nature of the influence of the distribution of the heat load indicates that during deprivation from the instructional uniform distribution of the heat load between network heaters, it is possible to obtain additional electricity.
Keywords: mathematical modeling, network water heater, modes of operation, combined heat and power plant, heat supply power plant.
Full text: Download in PDF
References
- Shubenko, A. L., Babenko, O. A., Goloshchapov, V. N., Lykhvar, N. V., & Kozlokov, A. Yu. (2013). Rabota teplofikatsionnoy turboustanovki T-100/120-130 pri nagreve setevoy vody v podogrevatele verkhney stupeni [Operation of the heating turbine unit T-100/120-130 when heating network water in the upper stage heater]. Problemy mashinostroyeniya – Journal of Mechanical Engineering – Problemy Mashynobuduvannia, vol. 16, no. 1, pp. 4–9 (in Russian).
- Rusanov, A., Shubenko, A., Senetskyi, O., Babenko, O., & Rusanov, R. (2019). Heating modes and design optimization of cogeneration steam turbines of powerful units of combined heat and power plant. Entrgetika, vol. 65, no. 1, pp. 39–50. https://doi.org/10.6001/energetika.v65i1.3974.
- Shubenko, O. L., Senetskyi, O. V., & Babenko, O. A. (2014). Pidvyshchennia efektyvnosti paroturbinnykh ustanovok riznoi potuzhnosti [Improving the efficiency of steam-turbine plants of different capacities]. Skhidno-yevropeiskyi zhurnal peredovykh tekhnolohii – Eastern-European Journal of Enterprise Technologies, vol. 2, no. 8 (68), pp. 13–19 (in Ukrainian). https://doi.org/10.15587/1729-4061.2014.23387.
- Smith, A. D. & Mago, P. J. (2014). Effects of load-following operational methods on combined heat and power system efficiency. Applied Energy, vol. 115, pp. 337–351. https://doi.org/10.1016/j.apenergy.2013.10.063.
- Rušeljuk, P., Lepiksaar, K., Siirde, A., & Volkova, A. (2021). Economic dispatch of CHP units through district heating network’s demand-side management. Energies, vol. 14, iss. 15, article ID 4553, 20 p. https://doi.org/10.3390/en14154553.
- (1989). Instruktsiya po ekspluatatsii parovoy turbiny T-100/120-130 [Operating instructions for steam turbine
T-100/120-130]. Kharkiv: Kharkov CHPP-5, 121 p. (in Russian). - (1979). Instruktsiya po ekspluatatsii turboagregata s turbinoy tipa T-250/300-240 [Operating instructions for a turbine unit with a T-250/300-240 turbine]. Kyiv: Kyiv CHPP-5, 214 p. (in Russian).
- (2000). Normativnyye energeticheskiye kharakteristiki bloka T-250 MVt Kharkovskoy TETS-5 [Standard energy characteristics of the T-250 MW unit of the Kharkov CHPP-5]. Kharkiv: Kharkov CHPP-5, 110 p. (in Russian).
- Trukhniy, A. D. & Lomakin, B. V. (2006). Teplofikatsionnyye parovyye turbiny i turboustanovki [Cogeneration steam turbines and turbine installations]. Moscow: Moscow Energy Institute Publ., 540 p. (in Russian).
- (2006). Instruktsiya po ekspluatatsii teplofikatsionnoy ustanovki Kharkovskoy TETS-5 [Operating instructions for the heating plant of Kharkov CHPP-5]. Kharkiv: Kharkov CHPP-5, 31 p. (in Russian).
- Lykhvar, N. V. (1998). Diagnostirovaniye sostoyaniya oborudovaniya turboustanovok TES i AES po termodinamicheskim parametram na osnove matematicheskogo modelirovaniya [Diagnosis of the state of equipment of turbine installations of thermal power plants and nuclear power plants according to thermodynamic parameters based on mathematical modeling]. Aviatsionnaya kosmicheskaya tekhnika i tekhnologiya – Aviation space technology and technology, iss. 5, pp. 362–365 (in Russian).
- Lykhvar, N. V. (2003). Gibkiye matematicheskiye modeli energoustanovok dlya optimizatsii rezhimov TETS [Flexible mathematical models of power plants for optimization of thermal power plant modes]. Sovershenstvovaniye turboustanovok metodami matematicheskogo i fizicheskogo modelirovaniya [Improving turbine installations using mathematical and physical modeling methods]: A collection of scientific papers, pp. 413–419 (in Russian).
- Lykhvar, N. V., Govorushchenko, Yu. N., & Yakovlev, V. A. (2003). Modelirovaniye teploenergeticheskikh ustanovok s ispolzovaniyem interaktivnoy skhemnoy grafiki [Modeling of thermal power plants using interactive circuit graphics]. Problemy mashinostroyeniya – Journal of Mechanical Engineering – Problemy Mashynobuduvannia, vol. 6, no. 1, pp. 30–41 (in Russian).
- Lykhvar, N. V. & Kosyak, Yu. F. (1986). Matematicheskoye modelirovaniye i optimalnoye proyektirovaniye paroturbinnoy ustanovki [Mathematical modeling and optimal design of a steam turbine installation]. Teploenergetika – Thermal power engineering, no. 2, pp. 69–72 (in Russian).
Received 30 November 2023
Published 30 March 2024